❱ Historic Landmark: Circa 1901 Durkin Boarding House, later the Centennial House, deeply rooted in mining heritage.
❱ Timeline: Kickoff fall 2025, targeting summer 2027 completion.
❱ Architectural Intent: Drift Studio’s vision blends preservation of historical integrity with modern livability // driftstudio.co
❱ Builder: PJ Builders, INC // pjbuilders.com
❱ Reconstruction Design: Approved plan preserves original character with salvaged materials and restored 1907 facade.
❱ Rare Survivor: One of only four remaining mining-era boarding houses; listed on the National Register in 1984.
❱ Structural Challenges: Condemned since 2007 due to mold, flood damage, and structural failure.
❱ Developer: Rockwell Square Ventures // rockwellsquareventures.com
❱ Sub-Zero & Wolf appliance package
❱ Game room / theater / bar in basement
❱ 3rd level flex space (ideal for office, additional bedroom, or game room)
❱ Reclaimed wood accents throughout
❱ Solar included
❱ Large rear yard overlooking creek
❱ Lounge area with firepit & hot tub
❱ Snow-melt system on driveway and sidewalks
❱ Off-street parking for up to 4 vehicles
❱ Oversized heated garage
Given its advanced decay and structural hazards, a full restoration became impractical. Instead, the Park City Historic Preservation Board approved a reconstruction using as much original material as possible, rebuilding faithfully in the 1907 style.
Under the vision of Drift Studio, groundbreaking begins fall 2025, with a hoped-for completion by summer 2027. It will emerge once again, not just as walls and history, but as a living monument to Park City’s resilient spirit.
*All information provided is deemed reliable but not guaranteed and is subject to change without notice. Square footage, lot size, features, and availability are approximate and should be independently verified.